- A bounded reliability-audit route exists and is measured
- The current public evidence lane supports target comparison and controlled perturbation reading
Reliability / GIL / current public state
Reliability / GIL
A bounded reliability-audit route exists and is measured
Current stateMEASURED
- The latest direct GIL rerun completed cleanly and reproduced 8/8 public PNG authority figures.CURRENT
Bundle-level determinism remains the next gate.
- The first Materials Project shear-modulus pilot reproduced under a locked local configuration.CURRENT
One external source, local execution and one bounded target route.
- The Materials Project bulk-modulus pilot reproduced under the same receipt discipline.CURRENT
Higher predictive coherence than shear does not establish physical causality.
- SYS-DEMO-01: Bounded GIL locked MP audit reproduced baseline R² = 0.820026 across 48 fits and 4,608 rescores in 179.20 s wall time.CURRENT ACCEPTED STATE
Bounded local audit and receipt under locked configuration.
- Causal proof
- Universal descriptor hierarchy
- Production certification