Implemented
No autonomous project-truth claim
A deterministic structural fallback route exists for Project Intelligence.CURRENT WITH LIMITATIONSOpen lane timelineEvery active check resolves through an event to a source derivative, limitations and a next gate.
No autonomous project-truth claim
A deterministic structural fallback route exists for Project Intelligence.CURRENT WITH LIMITATIONSOpen lane timelineNo external-validation promotion
The latest direct GIL rerun completed cleanly and reproduced 8/8 public PNG authority figures.CURRENTThe first Materials Project shear-modulus pilot reproduced under a locked local configuration.CURRENTThe Materials Project bulk-modulus pilot reproduced under the same receipt discipline.CURRENTSYS-DEMO-01: Bounded GIL locked MP audit reproduced baseline R² = 0.820026 across 48 fits and 4,608 rescores in 179.20 s wall time.CURRENT ACCEPTED STATEOpen lane timelineValve-enforced live composition is incomplete
Embedded and standalone EDS routes produced exact bundles on six shipped examples.CURRENTMUOS and HMA have a bounded composition and checkpoint architecture with explicit authority boundaries.CURRENT WITH LIMITATIONSKTS safely blocks unsupported recovery-authority promotion when grounding is incomplete.CURRENT WITH LIMITATIONSSYS-DEMO-02: Bounded fixture composition triggered 8 HOLD decisions and 8/8 held-write refusals before accepted memory commit.CURRENT ACCEPTED STATESYS-DEMO-03: Structural replay produced 0 failures, 9.23 ms restart retrieval, 25.80 ms rollback, restoring accepted baseline fingerprint exactly.CURRENT ACCEPTED STATEOpen lane timelineCurrent bounded TRS rerun does not support compact 35–40 mm claims
The bounded TRS compact-envelope rerun did not support a sub-100 mm compact route under the declared screen.CURRENTOpen lane timeline