Evidence History
A chronological view of what changed, what it supported, what remained limited and what gate followed.
- MEASURED_LOCAL_COMPUTE
SYS-DEMO-01: Bounded GIL locked MP audit reproduced baseline R² = 0.820026 across 48 fits and 4,608 rescores in 179.20 s wall time.
Lane: reliability. Ceiling: Founder-accepted locked local audit execution.
Next: Proceed to independent-source elastic property audit.
- CONTROLLED_INTEGRATION_FIXTURE
SYS-DEMO-02: Bounded fixture composition triggered 8 HOLD decisions and 8/8 held-write refusals before accepted memory commit.
Lane: governance. Ceiling: Fixture HOLD decision and held-write refusal verified.
Next: Expand valve-governed engine composition.
- CONTROLLED_INTEGRATION_FIXTURE
SYS-DEMO-03: Structural replay produced 0 failures, 9.23 ms restart retrieval, 25.80 ms rollback, restoring accepted baseline fingerprint exactly.
Lane: governance. Ceiling: Structural replay and accepted-checkpoint recovery verified.
Next: Proceed to valve-enforced cutover prerequisites.
- IMPLEMENTED
A deterministic structural fallback route exists for Project Intelligence.
Lane: legibility. Ceiling: Bounded project-legibility route only.
Next: Run an external applied repository pilot with a locked acceptance contract.
- IMPLEMENTED_PARTIAL_PROOF
MUOS and HMA have a bounded composition and checkpoint architecture with explicit authority boundaries.
Lane: governance. Ceiling: Bounded control-plane and memory-route implementation.
Next: Prove one valve-enforced engine-to-memory round trip.
- OPERATIONAL_BLOCK
KTS safely blocks unsupported recovery-authority promotion when grounding is incomplete.
Lane: governance. Ceiling: Safe blocking and recovery-packet scaffolding only.
Next: Resolve canonical recovery grounding and authority split.
- BUNDLE_PARITY
Embedded and standalone EDS routes produced exact bundles on six shipped examples.
Lane: governance. Ceiling: Bounded embedded-versus-standalone parity only.
Next: Complete valve-enforced cutover prerequisites.
- LOCKED_LOCAL_REPEAT
The Materials Project bulk-modulus pilot reproduced under the same receipt discipline.
Lane: reliability. Ceiling: Second MP target reproduced locally; bounded target comparison only.
Next: Consolidate cross-scale findings and choose the next independent source.
- LOCKED_LOCAL_REPEAT
The first Materials Project shear-modulus pilot reproduced under a locked local configuration.
Lane: reliability. Ceiling: First MP elastic pilot reproduced under locked local configuration.
Next: Compare recurring behaviour against an independent source.
- BOUNDED_NUMERICAL_SCREEN
The bounded TRS compact-envelope rerun did not support a sub-100 mm compact route under the declared screen.
Lane: engineering. Ceiling: No compact sub-100 mm support in the current bounded screen.
Next: Perform physical design validation and review cavity transport assumptions.
- MEASURED_REPEAT
The latest direct GIL rerun completed cleanly and reproduced 8/8 public PNG authority figures.
Lane: reliability. Ceiling: Direct public-route repeatability only.
Next: Complete bundle-level determinism and independent-source testing.